Every note starts from a real question on the cell side
and sets out the order of checks, the test conditions and the conclusions that
can be verified. Every figure quoted comes with its condition and method.
01
All notes
The notes are compiled from company measurements and published standards. Project-specific data is confirmed one to one during the sample stage.
In a semi-solid cell the peak puncture strength is only a threshold. What decides whether the cell still holds together under thermal duty is the retention of that strength after heat treatment. This article sets out the order of checks and the test conditions behind each figure.
A thermal shrinkage figure means nothing once the temperature, the duration and the atmosphere are stripped away. This article reads a figure through the GB/T 36363-2018 basis, explains the difference between the machine and cross directions, and separates it from the breakdown temperature, which is an independent measurement.
The breakdown temperature is a material-level property of a separator, and the separator does more in a cell than provide one barrier. This article sets out what the figure can support, what it cannot, and which parts of a cell safety assessment remain outside it.
A common worry is that adding a coating to the separator surface weakens it mechanically. This article reports the measured results for the ranges below 145 °C, 150 °C / 0.5 h and 180 °C / 0.5 h, and explains why the retention ratio and the absolute value have to be read separately.
Separator thickness takes up space inside the cell, but thickness and safety margin are not monotonically related. This article looks at four angles — space budget, mechanical retention, coating scheme and batch consistency — to set out what should be settled first and what second.
The process itself is a company trade secret and is not published, but the reasons behind the difficulty can be discussed: heat resistance and wetting pull in opposite directions, mechanical strength is a curve against temperature, the thickness budget narrows the scheme space, and batch consistency is harder than a single-batch peak. This article explains those four and gives five checkable actions for selection and verification.
Adhesion between separator and electrode, and wetting of the separator by electrolyte, are independent problems with different criteria, different methods and different failure modes. This article gives the criterion on the adhesion side (peel strength >30 N/m, GB/T 7122-96) and the criteria on the wetting side (porosity about 35%-45%, air permeability 226-366 s), explains why they must be read together, and points out a common misreading of the measurement basis.